Construction, Operation and Maintenance of Wind Farms
Uppsala University
Visby
Startdatum:
Slutdatum:
Studietakt: 67 %
Publicerad utbildningskatalog
Utbildningsinformation från den publicerade källan. Utbildningen och dess tidsbundna tillfällen hålls åtskilda.
Kod: 1GV156
The course introduces the logistical theory and best practices for wind power project construction, operation and decommissioning. These are used to create a logistical plan which identifies and provides solutions for potential problems and risks of a project. In addition, the course will identify key concerns and solutions for the construction and operation phases of a wind power project which are used during its planning, including health and safety issues. Included in this the lifetime operations and maintenance costs, both onshore and offshore will be reviewed in both theory and practice.
A Bachelor's degree in engineering, science or social science. Also required is 45 credits at Master's level in wind power project management. Proficiency in English equivalent to the Swedish upper secondary course English 6.
Varje tillfälle har egna datum och villkor. Avslutade tillfällen behålls som historik och innebär inte att en ny ansökan är öppen.
Uppsala University
Visby
Startdatum:
Slutdatum:
Studietakt: 67 %
Hämtad: .
Publicerad: .
Publiceringsversion: 8e217193-f5fa-4778-b085-a4521fd03e8d
Kontrollsumma: 1b0dc54c0fc8a359f83ba9dc8f9d468479ce432de4c03bce3b8b33dd67fe3f6c
Senast ändrad enligt källan: 2026-03-09T12:14:17