Construction, Operation and Maintenance of Wind Farms
Uppsala University
Visby
Start date:
End date:
Pace of study: 67 %
Published education catalogue
Education information from the published source. The education record and its time-bound offerings are kept separate.
Code: 1GV156
The course introduces the logistical theory and best practices for wind power project construction, operation and decommissioning. These are used to create a logistical plan which identifies and provides solutions for potential problems and risks of a project. In addition, the course will identify key concerns and solutions for the construction and operation phases of a wind power project which are used during its planning, including health and safety issues. Included in this the lifetime operations and maintenance costs, both onshore and offshore will be reviewed in both theory and practice.
A Bachelor's degree in engineering, science or social science. Also required is 45 credits at Master's level in wind power project management. Proficiency in English equivalent to the Swedish upper secondary course English 6.
Each offering has its own dates and conditions. Closed offerings are retained as history and do not mean that a new application is open.
Uppsala University
Visby
Start date:
End date:
Pace of study: 67 %
Retrieved: .
Published: .
Publication version: 8e217193-f5fa-4778-b085-a4521fd03e8d
Checksum: 1b0dc54c0fc8a359f83ba9dc8f9d468479ce432de4c03bce3b8b33dd67fe3f6c
Last changed according to the source: 2026-03-09T12:14:17